7–10 EPM 2200 POWER METER – INSTRUCTION MANUAL
CONFIGURING COM OPTION B: BACNET MS/TP WITH MODBUS TCP/IP CHAPTER 7: COM OPTION B: BACNET MS/TP WITH MODBUS TCP/IP
• Max Info Frames - this is the maximum number of information frames the node is 
allowed to send before it needs to pass the token.
• Max Master - this is the highest allowable address for master nodes (cannot be 
higher than 127); a Max master greater than 36 is recommended for data sets.
9. Click the Advanced button to display additional settings. 
Note
We recommend you do not change any Advanced settings.
10. Click OK to process your changes.
11. Click Activate Configuration from the left side of the webpage to implement any 
changes you made. You will see the page shown below.
12. Click the Confirm button to process the changes. You will see the message shown 
below (the IP Address shown in the link is just an example).
13. The meter resets. Connect the meter Ethernet cable to your Network (remove it from 
your PC). You can now connect to the meter through your Network using the new IP 
address.