EasyManua.ls Logo

GE Multilin PQM - S4 ALARMS;CONTROL continued

GE Multilin PQM
348 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9–10 PQM POWER QUALITY METER – INSTRUCTION MANUAL
COMMISSIONING CHAPTER 9: COMMISSIONING
S4 ALARMS/CONTROL continued
POWER FACTOR
POWER FACTOR LEAD 1 RELAY
POWER FACTOR LEAD 1 PICKUP
POWER FACTOR LEAD 1 DROPOUT
POWER FACTOR LEAD 1 DELAY sec.
POWER FACTOR LAG 1 RELAY
POWER FACTOR LAG 1 PICKUP
POWER FACTOR LAG 1 DROPOUT
POWER FACTOR LAG 1 DELAY sec.
POWER FACTOR LEAD 2 RELAY
POWER FACTOR LEAD 2 PICKUP
POWER FACTOR LEAD 2 DROPOUT
POWER FACTOR LEAD 2 DELAY sec.
POWER FACTOR LAG 2 RELAY
POWER FACTOR LAG 2 PICKUP
POWER FACTOR LAG 2 DROPOUT
POWER FACTOR LAG 2 DELAY sec.
DEMAND
PHASE A CURRENT DMD RELAY
PHASE A CURRENT DMD LEVEL A
PHASE B CURRENT DMD RELAY
PHASE B CURRENT DMD LEVEL A
PHASE C CURRENT DMD RELAY
PHASE C CURRENT DMD LEVEL A
NEUTRAL CURRENT DMD RELAY
NEUTRAL CURRENT DMD LEVEL A
3Φ POS REAL POWER DMD RELAY
3Φ POS REAL POWER DMD LEVEL kW
3Φ POS REACT POWER DMD RELAY
3Φ POS REACT POWER DMD LEVEL kvar
3Φ NEG REAL POWER DMD RELAY
Table 9–1: PQM Setpoints (Sheet 10 of 12)
Courtesy of NationalSwitchgear.com

Table of Contents

Related product manuals