EasyManua.ls Logo

GE Proteus XR/a

GE Proteus XR/a
138 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PROTEUS XR/a
GE MEDICAL SYSTEMS Operator Manual
REV 11 DIRECTION 2259724-100
ii
All electrical installations that are preliminary to positioning of the equipment at the site prepared for the
equipment shall be performed by licensed electrical contractors. In addition, electrical feeds into the Power
Distribution Unit shall be performed by licensed electrical contractors. Other connections between pieces of
electrical equipment, calibrations, and testing shall be performed by qualified GE Medical personnel. The
products involved (and the accompanying electrical installations) are highly sophisticated, and special
engineering competence is required. In performing all electrical work on these products, GE will use its own
specially trained field engineers. All of GE’s electrical work on these products will comply with the requirements
of the applicable electrical codes.
The purchaser of GE equipment shall only utilize qualified personnel (i.e., GE’s field engineers, personnel of
third-party service companies with equivalent training, or licensed electricians) to perform electrical servicing on
the equipment.
CERTIFIED ELECTRICAL CONTRACTOR STATEMENT
If you have any comments, suggestions or corrections to the information in this document,
please write them down, include the document title and document number, and send them to:
GENERAL ELECTRIC MEDICAL SYSTEMS
MANAGER - INFORMATION INTEGRATION
A
MERICAS, X-RAY W-622
P.O. BOX 414
MILWAUKEE, WI 53201-0414
FOR TRAINING PURPOSES ONLY!
NOTE: Once downloaded, this document is UNCONTROLLED, and therefore may not be the latest revision. Always confirm revision status against a validated source (ie CDL).

Table of Contents

Related product manuals