EasyManua.ls Logo

GE TransPort PT900 - Finalizing Fixture Installation

GE TransPort PT900
190 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 2. Installation
TransPort
®
PT900 User’s Manual 15
2.5.3 Mounting the Clamp-On Fixture (cont.)
9. After final alignment is complete, fully tighten both chains by turning the
nut on top of both chain screw mechanisms (see Figure 16 below) until the
chain is tight enough to resist any fixture movement.
Figure 16: Secure the Fixture to the Pipe
Note: As the last two steps affect each other, repeat them until the fixture is both
properly aligned and securely fastened to the pipe.

Table of Contents

Related product manuals