EasyManua.ls Logo

GEM 550 - Maintenance: Actuator and Seals; Actuator Removal, Seal Replacement, Mounting

GEM 550
44 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
550
42 / 44
21 Declaration of incorporation
Declaration of Incorporation
according to the EC Machinery Directive 2006/42/EC, Annex II, 1.B
for partly completed machinery
Manufacturer: GEMÜ Gebr. Müller Apparatebau GmbH & Co. KG
Postfach 30
Fritz-Müller-Straße 6-8
D-74653 Ingelfingen-Criesbach
Description and identification of the partly completed machinery:
Make: GEMÜ Globe valve, pneumatically operated
Serial number: from December 29, 2009
Project number: SV-Pneum-2009-12
Commercial name: Type 550
We hereby declare that the following essential requirements of the Machinery Directive 2006/42/EC
have been fulfilled:
1.1.3.; 1.1.5.; 1.1.7.; 1.2.1.; 1.3.; 1.3.2.; 1.3.3.; 1.3.4.; 1.3.7.; 1.3.9.; 1.5.3.; 1.5.5.; 1.5.6.; 1.5.7.; 1.5.8.;
1.5.9.; 1.6.5.; 2.1.1.; 3.2.1.; 3.2.2.; 3.3.2.; 3.4.4.; 3.6.3.1.; 4.1.2.1.; 4.1.2.3.; 4.1.2.4.; 4.1.2.5.; 4.1.2.6. a);
4.1.2.6. b); 4.1.2.6. c); 4.1.2.6. d); 4.1.2.6. e); 4.1.3.; 4.2.1.; 4.2.1.4.; 4.2.2.; 4.2.3.; 4.3.1.; 4.3.2.; 4.3.3.;
4.4.1.; 4.4.2.; 5.3.; 5.4.; 6.1.1.; 6.3.3.; 6.4.1.; 6.4.3.
We also declare that the specific technical documentation has been compiled in accordance with
part B of Annex VII.
We expressly declare that the partly completed machinery complies with the relevant provisions of
the following EC directives:
2006/42/EC:2006-05-17: (Machinery Directive) Directive 2006/42/EC of the European Parliament
and of the Council of 17 May 2006 on machinery, and amending
Directive 95/16/EC (recast) (1)
The manufacturer or his authorised representative undertake to transmit, in response to a reasoned request
by the national authorities, relevant information on the partly completed machinery. This transmission takes
place:
electronically
This does not affect the intellectual property rights!
Important note! The partly completed machinery
may be put into service only if it was determined,
where appropriate, that the machinery into which the partly completed machinery is to be
installed meets the provisions of this Directive.
Joachim Brien
Head of Technical Department
Ingelfingen-Criesbach, February 2013

Table of Contents

Other manuals for GEM 550

Related product manuals