19
3.3 Installation
a. Remove packaging material and check if the machine is complete without any
transportation damage
b. Remove cushion material inside corners of the arch.
c. After positioning the machine, do make sure lock brake of casters (two front casters
with brake)
Note: when moving the machine again, do remember to unlock the brake of casters,
then relocate and lock again.
Note: when moving the machine, do turn the machine power off and make sure cable is
on the table in case cable damaged.