EasyManua.ls Logo

GM PowerUp - Page 18

GM PowerUp
29 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18PowerUp Installation and Operation Manual
L2 L1PE
Location Wire Gauge Torque
L1 / L2 6AWG max 19 ± 2 in-lbs (2.2 ± 0.2 Nm)
PE 6-10AWG 19 ± 2 in-lbs (2.2 ± 0.2 Nm)
Once you have connected the power wires you can proceed with configuring
the DIP switches.

Related product manuals