7 MAINTENANCE DOCUMENTATION
The documents to use for the maintenance of the lift are those required by the EN81-20 and by the rules in
force, particularly the following:
- T
HIS MAINTENANCE MANUAL
• A provided book according with EN 81-20 7.3, which should contain:
- I
NSTALLATION
P
ROJECT DRAWS
(EN81-20
7.3.2.
A
.5).
- W
IRING DIAGRAMS
(EN81-20
7.3.2.
A
.6)
- P
ERIODICAL AND EXTRA MAINTAINING CHECKS RESULTS
(EN81-20
7.3.2.
B
).
- D
ATED COPIES OF EXAMINATIONS AND INSPECTIONS REPORTS
,
WITH OBSERVATIONS
(EN81-20
7.3.2.
B
).
- D
ECLARATION OF CONFORMITY COPY
- C
OPY OF THE LIFT ACTIVATION REQUEST
,
THAT
,
ACCORDING TO LOCAL LAWS
,
OWNER OR LEGAL
REPRESENTATIVE SEND TO THE PROPER OFFICE
,
- C
OPY OF THE LIFT ACTIVATION COMMUNICATION
,
WITH REGISTER NUMBER
,
THAT THE PROPER
OFFICE,
ACCORDING TO LOCAL LAWS
,
SEND TO OWNER OR LEGAL REPRESENTATIVE
All the documentation for a correct and safe maintenance of the lift must be stored by the installation owner.
Please remember that this documentation is considered part of the plant and must be complete, well stored
and unabridged in every part.
In order to maintain the readability, the documentation shouldn’t be damaged and shouldn’t have missing
parts. Moreover, do not tear or deteriorate sheets during consulting.
Safety precaution during maintenance
During installation and maintenance operations, it is compulsory to comply with the national regulations in
force on workplace safety.
ATTENTION
Before starting any installation operation. ALWAYS check that all safety devices, both mechanical
and electrical, are activated and functioning correctly
.
Tooling
No special tools are required unless expressly provided by component manufacturers supplied by third parties.
In this case, the related features and operating instructions are indicated in the manuals supplied with them.
Materials unloading and storage
Load and unload materials with care.
Verify, within the law time limits and terms, that all materials received are those ordered and are complete.
Check the condition of all components and materials upon reception at the building yard, to verify if any damage
occurred during transport; immediately inform GMV Spa in case any part is missing or in case of damage.
Store the electrical and electronic components in a cool and dry place in their original packages, at a temperature
between 5°C and 40°C.
If, for any reason, it was not possible to install the plant immediately, periodically check the stored components to
prevent possible damages due to a prolonged storage in bad conditions.
Check that the documentation related to the system is enclosed.
Pay particular attention to the discharge of pistons and guides by using appropriate means.
Do not unload the pistons from the truck by throwing them to the ground, but let them roll on piles.