Setup
22 312065V
RELIEF/SPRAY valves, Route hose back to
component A and B drums. See FIG. 1, page 12.
2. Alternately: Secure supplied bleed tubes (N) in
grounded, sealed waste containers (H). See FIG. 2,
page 13.
Install Fluid Temperature Sensor
(FTS)
The Fluid Temperature Sensor (FTS) is supplied. Install
FTS between main hose and whip hose. See Heated
Hose manual 309572 for instructions.
Connect heated hose
NOTE: See Heated Hose manual 309572 for detailed
instructions on connecting heated hoses.
NOTE: The fluid temperature sensor (C) and whip hose
(D) must be used with heated hose, see page 22. Hose
length, including whip hose, must be 60 ft (18.3 m)
minimum.
1. Turn main power OFF .
2. Assemble heated hose sections, FTS, and whip
hose.
3. Grease with Fusion grease and connect fluid hoses
to proportioner fluid manifold (M): red for hardener
(ISO, blue for resin (RES).
NOTE: The manifold hose adapters (N, P) allow use of
1/4 in. (6.4 mm) and 3/8 in. (9.5 mm) ID fluid hoses. To
check adapter tightness, torque 1/4 in. and 3/8 in. ID
hoses to:
• A side (HA) to 14 ft-lb (19 N•m).
• B side (HB) to 20 ft-lb (27 N•m).
NOTE: To use 1/2 in. (13 mm) ID fluid hoses, remove
the adapters (N, P) from the proportioner fluid manifold
and install them in the FTS or 3/8 in. ID hose inlets.
Torque 1/2 in. ID hoses to:
• A side (HA) to 43 ft-lb (58 N•m).
• B side (HB) to 55 ft-lb (74 N•m).
WLD
+%
+$
NOTE: For proportioners with a termination box (TB),
follow step 8d. For proportioners with electrical splice
connectors (v), follow step 5.
TI10954a
BA
BB
R
R
SB
SA