EasyManuals Logo

GRASS VALLEY Trinix User Manual

GRASS VALLEY Trinix
232 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #145 background imageLoading...
Page #145 background image
Output Monitoring
Planning and Installation Manual 145
For all expanded systems with Monitoring, the “B” switch on the rear
of the chassis must be set to ON (closed). See page 98 (128 x 128);
page 100 (256 x 256); or page 102 (512 x 512).
The “Monitor” switch must also be set to identify the total number of
outputs (see page 141).
In systems controlled by SR-33000 boards, Monitor Expansion jumpers
JN3 and JN4 on the SR-33000 boards must be set to “Exp.” See page 120.
Note Output monitoring is not available for input-expanded systems con-
trolled by an SR-33000 Sync/OPM board.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GRASS VALLEY Trinix and is the answer not in the manual?

GRASS VALLEY Trinix Specifications

General IconGeneral
BrandGRASS VALLEY
ModelTrinix
CategoryNetwork Router
LanguageEnglish

Related product manuals