EasyManua.ls Logo

Growatt SPH5000 - 6.4 Display and button

Growatt SPH5000
66 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4. Drill four Ф8 holes at the mark point, the depth is not less than 55mm.
5. Knock four explosion bolt into Ф8 holes (As the chart 5.8b below).
6. Hang the energy storage machine on the four setscrews (As the chart 5.8c below).
7. Lock the nut of setscrew (As the chart 5.8d below).
8. The whole installation has finished.
a)
b) c)
d)
Chart 5.8

Other manuals for Growatt SPH5000

Related product manuals