46
Index
A
AC
installation, 8
ins
tallation flow, 9
power cord conne
ction, 18
trouble
shooting power supply failure, 22
Appendix
A (Chassis views and technical
specifications), 30
Appendix B (LEDs), 42
B
built-in fan op
erational status, 27
C
cabl
e
console cable connection, 15
cha
ssis
cooling and ventilation, 3
view
s, 30
checklist (pre-install
ation), 6
clea
nliness (installation site), 2
c
onnecting
AC power cord, 18
con
sole cable, 15
cop
per Ethernet port, 16
DC p
ower cord, 18
fiber port, 16
con
sole cable connection, 15
controlle
r engine
device electronic label data display, 26
device info
rmation display, 26
cooli
ng requirements (installation site), 3
CPU u
sage display, 26
D
DC
power cord connection, 18
device
AC power cord connection, 18
built-in fan op
erational status, 27
con
sole cable connection, 15
cop
per Ethernet port connection, 16
CPU u
sage display, 26
D
C power cord connection, 18
displ
aying hardware information, 24
electroni
c label data display (on controller
engine), 26
electroni
c label data display (on switching
engine), 26
fiber po
rt connection, 16
grou
nding, 12
informatio
n display (on controller engine), 26
informatio
n display (on switching engine), 26
ins
tallation verification, 19
manag
ement and maintenance, 24
memory u
sage display, 27
operational statistics, 24
power supply
operating state, 28
powerin
g on, 19
rack installati
on, 10
rebo
oting, 28
trouble
shooting, 22
w
orkbench device mount, 9
displ
aying
built-in fan operational status, 27
device CPU
usage, 26
device el
ectronic label data (on controller
engine), 26
device el
ectronic label data (on switching
engine), 26
device h
ardware information, 24
device info
rmation (on controller engine), 26
device info
rmation (on switching engine), 26
device me
mory usage, 27
device o
perational statistics, 24
power supply
operating state, 28
dus
t (installation site), 2
E
electri
city
AC power cord connection, 18
D
C power cord connection, 18
device g
rounding, 12
device p
ower on, 19
electri
cal cooling requirements, 3
electroma
gnetic interference. Use EMI
electrostatic discharge. Use ESD
EMI prevention, 4
ESD preventi
on, 3
safety re
commendations, 1
trouble
shooting power supply failure, 22
electroni
c label data display, 26
EMI prevention, 4
environ
ment
installation site, 2