Figure 6 Remove the pump clamp
Prepare for shipping
C A U T I O N
Chemical exposure hazard. Obey laboratory safety procedures and wear all of the personal protective
equipment appropriate to the chemicals that are handled. Refer to the current safety data sheets
(MSDS/SDS) for safety protocols.
To prepare the analyzer for shipping, do the steps that follow.
Items to collect:
Beaker with deionized water (2x) Original packaging
1. Remove the reagents from the reagent lines as follows:
a. Remove the indicator bottle and buffer bottle from the analyzer.
b. Put two beakers (or containers) that contain deionized water in the analyzer.
c. Put the indicator bottle tubing and the buffer bottle tubing in the beakers.
d. Push menu, then select SENSOR SETUP > [select analyzer] > PRIME.
The analyzer removes the reagents from the reagent lines.
2. Remove the deionized water from the reagent lines as follows:
a. Remove the indicator bottle tubing and the buffer bottle tubing from the beakers.
b. Remove the two beakers from the analyzer.
c. Push menu, then select SENSOR SETUP > [select analyzer] > PRIME.
The analyzer removes all of the liquid from the reagent lines.
3. Disconnect the analyzer cable from the controller.
4. Turn the shut-off valve to the closed position to stop sample flow to the Y-strainer.
5. Disconnect the sample inlet (black) tubing and drain (clear) tubing from the analyzer.
6. Remove the pump clamp. Refer to Figure 6 on page 23.
7. Remove the tubing harness and stir bar from the analyzer. Keep the tubing harness for shipment
with the analyzer. Refer to Step 3: Install the stir bar and tubing harness on page 13.
8. Install the pump clamp without the tubing harness. Put tape on the tubing clamp to hold the tubing
clamp tightly.
9. Remove the water from the cell with a disposable dropper or a no-lint cloth.
English
23