EasyManua.ls Logo

Hach CL17sc - Installation Guidelines

Hach CL17sc
198 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation guidelines
The analyzer is supplied with a standpipe installation kit or a pressure regulator installation kit to
control the water pressure to the analyzer. The user selects the installation kit at the time of
purchase.
Install the analyzer indoors in an environment with minimum vibration. Refer to the operating
temperature and humidity specifications in Specifications on page 3.
Do not install the analyzer in direct sunlight or near a heat source.
For standpipe installations, install the analyzer in a location with 61 cm (2 ft) of free space above
the analyzer for the standpipe mounting.
Install the analyzer near an open drain. Refer to local regulatory agency instructions for disposal.
Step 1: Air purge (optional)
Air purge may be necessary if the analyzer is installed in a location with high humidity and/or fumes
that cause corrosion. The air purge keeps positive pressure in the instrument with dry and clean air.
Supply clean, dry instrument-quality air at 0.003 m
3
/minute (0.1 ft
3
/minute) at 20 psig maximum.
Refer to the illustrated steps that follow. The
3
/
8
-inch quick-connect fitting and tubing is supplied by
the user.
8 English

Table of Contents

Related product manuals