EasyManua.ls Logo

Hach POLYMETRON 8810 - Cable Preparation

Hach POLYMETRON 8810
58 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4.5.1.1 Cable preparation
W A R N I N G
To conform with security standards and to respect the EMC compliancy of the analyzer, this
procedure must be followed for all user supplied cables before connecting them to the electronic
unit of the analyzer.
Materials required:
Shielded cable (diameter minimum 4.5 mm - maximum 6 mm) with 2 or 3 wires
depending on function (RS232 = 3 wires, Alarm = 2 wires, etc.)
Metal cable gland
Grounding ferrule
2 or 3 protective plugs for the exposed wires
Clamp for the grounding ferrule
Crimping pliers for the protective plugs
Installation
13

Table of Contents

Other manuals for Hach POLYMETRON 8810

Related product manuals