EasyManua.ls Logo

Hägglunds CMp - Page 55

Default Icon
64 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
RE 15409, Version 08.2022, Bosch Rexroth AB
Installation | CMp 55/64
After the box is steadily mounted following the instructions in section 7.2: Mounting
the S-Link Monitoring Unit, you can proceed with the electrical installation.
1.
1.
2.
4.
4
1. Install the
communication cable
(1-02)from the S-Link
Monitoring Unit to the
Spider control unit.
Contact for communicaton cable
DD00070442-2, DD00078734
2. Install the antenna
cable (1-03) from the
S-Link Monitoring Unit
to the Spider control
unit
.
3. Mount the magnetic
antenna outside the
power unit positioned
as high as possible.
4. Install the power cable
(1-01) from the S-Link
Monitoring Unit to the
Spider control unit.
.
DD00078710