RE 15409, Version 08.2022, Bosch Rexroth AB
Installation | CMp 55/64
After the box is steadily mounted following the instructions in section 7.2: Mounting
the S-Link Monitoring Unit, you can proceed with the electrical installation.
1.
1.
2.
4.
4
1. Install the
communication cable
(1-02)from the S-Link
Monitoring Unit to the
Spider control unit.
Contact for communicaton cable
DD00070442-2, DD00078734
2. Install the antenna
cable (1-03) from the
S-Link Monitoring Unit
to the Spider control
unit
.
3. Mount the magnetic
antenna outside the
power unit positioned
as high as possible.
4. Install the power cable
(1-01) from the S-Link
Monitoring Unit to the
Spider control unit.
.
DD00078710