42
Maintenance and Service
5.3 Maintenance plan
Hako system maintenance,
customer
The following maintenance work must
be completed by the customer at the in-
tervals stipulated.
Activity
Interval
Daily
Charge the battery o
Check the battery acid level, fill distilled water if necessary (only towards the end of
the charging process)
o
Check the rotary brush for foreign bodies, e.g. wire, tape, etc. o
Function test of the parking brake o
Check the tires o
Check the hydraulic system for leaks o
Check the service brake o
Check the electrical system o
Check the control and safety equipment o
Shake the dust filter clean o
Check the dirt hopper, empty as necessary o
Test drive and function test o