5 - Operation
103
FastFlush
1. Go to AutoWash by pressing .
2. Press to enter FastFlush.
3. Begin driving in the field just sprayed. Spray at normal driving
speed to avoid overdosing.
4. Press to start the program.
5. In field (A), drive approximately 800 metres (9 km/h) until FastFlush
has finished.
μ
ATTENTION! For sprayers with FlexCapacity pump, the controller
prompts when to turn the pump ON/OFF during the FastFlush/MultiRinse program.
÷
NOTE! External fill hoses from injector to External filling coupler and to suction SmartValve is not flushed. This contains
approximately 8 litres.
The following diagram show the valve positions during the FastFlush program.
11:18
12:18
13:18
14:18
15:18
17:18
18:18
Pre-start MainTank emptying
Pressure
SmartValve
Suction
SmartValve
Main
Spray
ON/OFF
CycloneFilter
Boost Line
Valve
Agitation
Valve