5 - Operation
104
MultiRinse
1. Go to AutoWash by pressing .
2. Press to enter MultiRinse.
3. Begin driving in the field just sprayed. Spray at half of normal
spraying speed, whereby dose rate (litres/ha) is increased.
4. Press to start the program.
5. In field (A), drive approximately 800 metres (4.5 km/h) at first cycle,
then further1700 metres (9 km/h) until MultiRinse has finished.
÷
NOTE! Driving speed reduction must be due to lower gear
selection to keep nominal PTO revolutions. The operator is given a warning in the controller display if the PTO
revolutions get to low or high for AutoWash to operate.
÷
NOTE! External fill hoses from injector to External filling coupler and to suction SmartValve is not flushed. This contains
approximately 8 litres.
The following diagram show the valve positions during the MultiRinse program.
A
11:58
12:58
13:58
14:58
15:58
17:58
18:58
28:58
21:58
22:58
23:58
24:58
25:58
27:58
31:58
32:58
38:58
33:58
34:58
35:58
37:58
41:58
42:58
43:58
44:58
45:58
47:58
48:58
58:58
51:58
52:58
53:58
54:58
55:58
57:58
Pre-start MainTank emptying
Pressure
SmartValve
Suction
SmartValve
Main
Spray
ON/OFF
CycloneFilter
Boost Line
Valve
Agitation
Valve

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Hardi SMARTCOM ISOBUS UT SW A.2.2 Series and is the answer not in the manual?

Hardi SMARTCOM ISOBUS UT SW A.2.2 Series Specifications

General IconGeneral
BrandHardi
ModelSMARTCOM ISOBUS UT SW A.2.2 Series
CategoryFarm Equipment
LanguageEnglish

Related product manuals