Email: service@haskris.com
Fluid fill:
❑ Piping has been flushed with external water until water runs clear.
❑ 100psi gas has been applied to piping loop for 30 minutes to check for leaks.
❑ Glycol concentrate, provided with the OPC, has been diluted with drinking/spring water to
achieve a 35-40% glycol/drinking water solution.
❑ Tank and entire piping loop have been filled with 35-40% glycol/drinking water solution,
and piping loop has been purged of air.
❑ Additional propylene glycol/drinking water solution is on-hand for service contractor to top
off system when start-up is performed.
❑ Piping has been checked for fluid leaks.
Installation Completed By (Please Print):
Company: ________________________________ Phone: _______________ Email: _______________
Name: ____________________________________________________ Title: _________________________
Signature: ________________________ Date: ________________