EasyManua.ls Logo

Haskris OPC5 - Pump Priming

Default Icon
55 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 38 of 55
Email: service@haskris.com
Phone: 001 847 956 6420
Pump Priming
Purpose: All fluid is removed from the pump head prior to shipment from Haskris. When starting the
pump, it needs to be filled with fluid. This process is called priming the pump.
When the reservoir is full, the pump suction line is “flooded”. In some cases, this flooded suction will
automatically prime the pump. When the chiller is turned ON, the pump will run. If the controller
display shows the pump generating pressure, then the pump is primed.
If the controller display shows a low pressure <10 psi, then the pump did not automatically prime.
Follow the procedure below.
1. Identify the priming plug on the face of the pump head
2. Use a 10mm hex or Allen wrench to loosen the priming plug slightly. The plug should remain
threaded into the port, but air and liquid should be able to escape.
3. Allow air and a small amount of fluid to escape
4. Tighten the priming plug
Pump priming plug circled

Table of Contents

Related product manuals