Table of Contents F30 01
Page 4 of 52 HI 800 145 E Rev. 2.00
4 Start-up 28
4.1 Installation and Mounting 28
4.1.1 Connecting the Digital Inputs 28
4.1.1.1 Surges on Digital Inputs 29
4.1.2 Connecting the Digital Outputs 29
4.1.3 Cable Plugs 30
4.1.4 Mounting the F30 in Zone 2 31
4.2 Configuration 32
4.3 Configuration with SILworX 32
4.3.1 Parameters and Error Codes for the Inputs and Outputs 32
4.3.2 Digital Inputs for F30 33
4.3.2.1 Tab: Module 33
4.3.2.2 Tab: DI 20: Channels 34
4.3.3 Digital Outputs for F30 35
4.3.3.1 Tab: Module 35
4.3.3.2 Tab: DO 8: Channels 36
4.4 Configuration with ELOP II Factory 37
4.4.1 Configuring the Inputs and Outputs 37
4.4.2 Signals and Error Codes for the Inputs and Outputs 37
4.4.3 Digital Inputs for F30 38
4.4.4 Digital Outputs for F30 40
5 Operation 41
5.1 Handling 41
5.2 Diagnosis 41
6 Maintenance 42
6.1 Faults 42
6.2 Maintenance Measures 42
6.2.1 Loading the Operating System 42
6.2.2 Proof Test 42
7 Decommissioning 43
8 Transport 44
9 Disposal 45
Appendix 47
Glossary 47
Index of Figures 48
Index of Tables 49
Index 50