Hitachi Advanced Server HA820 G2 User Guide 106
8.
Install the 8 SFF front drive cage option.
9.
Connect the power and data cables.
10.
Install the fan cage.
11.
Install the air baffle.
12.
Install the access panel
13.
Slide the server into the rack.
14.
Connect each power cord to the server.
15.
Connect each power cord to the power source.
16.
Power up the server.
Installing a front 8 SFF SAS/SATA drive cage in box 2
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
•
T-15 Torx screwdriver
•
The components included with the hardware option kit
Procedure
1.
Power down the server.
2. Remove all power:
a.
Disconnect each power cord from the power source.