Hitachi Advanced Server HA820 G2 User Guide 62
Prerequisites
Before you install this option, make sure that you have the following items available:
•
No. 1 Phillips screwdriver
•
Optional Q0H80A 800W DC Power Cable Kit can be purchased from an authorized reseller.
•
If you are not using an input power cord option, the power supply cabling must be made in
consultation with a licensed
electrician and be compliant with local code.
•
If you are replacing the factory installed ground lug, use the KST RNB5-5 crimp terminal ring or
equivalent. Use an
M5-0.80 x 8 screw to attach the ground lug to the power supply.
Procedure
1.
Remove the power supply blank.
2.
Remove the ring tongue.
3.
Crimp the ring tongue to the ground cable from the -48 V DC power source.