1.
Learn each device.
Step 1 can be replaced with steps
a. throu
h c.
NOTE: A device is
learned
when its address or serial num-
ber is recorded in the CU.
a. Enter the information from Install the S
stem sec-
tion, step 5, into the PRO 9000 software
Menu:
Pro
ram/Pollin
and downloadin
the Pollin
Table
into the I9000 Control Unit
see form no. 74-3046,
Intelli
uard 9000 Pro
rammer’s Guide for more
information
.
b. Before downloadin
, set the baud rate for COM 3 to
match the baud rate selected in PRO 9000. Use an
CC2 connected to the control unit to set the baud
rate since all CC2s are learned automaticall
at
power up.
c. Exit from the CC2 Confi
uration Menu for chan
es
to become effective. When used with PRO 9000, the
maximum supported baud rate for the I9000 with
EBI Orbix
8950-109
firmware is 4800 baud.
2.
Check the communication status for each device:
F = COM fail
M = Mar
inal
latched status, clear with Reset Lo
command
.
NOTES:
— To view the F and M
COM fail and Mar
inal
,
from the CC2
o to the 2-ASSIGN menu
sub-
menu of the CONFIGURATION menu, entered b
usin
the Mode ke
.
— The F and M appear on the far ri
ht first line of
text for each device in the table
ou must scroll to
view each device
.
— When ever
thin
is normal, no characters appear
on the far ri
ht of the first line of text.
— The
F
COM fail
clears automaticall
when com-
munication is restored to the device exhibitin
an
F
.
3.
Disarm each armed area.
4.
Pro
ram the tables.
System Test
Perform a
WALK TEST
to make sure all devices with
actuators work properl
. This must be done at initial
installation and each time a device is added to or removed
from the s
stem.
1.
With all areas disarmed, press
TEST
on the CC2 to
enter the TEST Menu.
2.
Enter
our ID and code number.
3.
Press
3
to select
WALK TEST
and press
ACCEPT
.
4.
Select the test area.
5.
Walk throu
h the buildin
and test each device. A beep
sounds on all CC2s and KIDs assi
ned to the test area
as each alarm is tri
ered.
NOTE: When usin
the
WALK TEST
, Hold-up Actuators will
not test oka
in the Event Lo
.
6.
If Hold-up Actuators
8003-284, red buttons
are tested,
a manual
Reset Detectors
must be made after step 7.
7.
Press
X
to stop the test.
8.
Press
MODE
to enter the MODE Menu.
9.
Press
3
to select
EVENT LOG
.
10.
View the result of each area in the Event Lo
to make
sure that each device is respondin
as desi
ned.
The results of the alarm points tested in the
WALK TEST
are
shown in lower case characters when successfull
tested.
NOTE: If the technician ID
00
and code number
9999 =
default value
were used in step 2, a communication
test is automaticall
performed when the
WALK
TEST
is terminated. The communication test
COM
Test
results are shown as alarms
text in capital let-
ters
and indicate proper communication with each
device assi
ned to the specified areas.
System Layout and Wiring
The desi
ner plans the s
stem based on buildin
construction
and customer needs. This plan re
uires the wirin
for the
I9000. The wirin
must be routed before mountin
an
device.
Wirin
must be done b
a
ualified person and must compl
with state and local buildin
codes.
1.
Map the route for the wires between each device.
2.
With a pencil, li
htl
mark the mountin
locations for
each device.
3.
Install the wirin
.
4.
Usin
a continuit
tester, make sure there are no opens,
wire-to-wire shorts, or wire-to-
round shorts before con-
nectin
the devices.
Fi
. 3 shows a sample wirin
plan. See Table 1 for
recommended cable t
pes.
Sample Installation Plan
Fi
. 4 shows a t
pical floor plan with I9000 components in
each room.