41 Expansion shelf 1Array
2 5OCP port 1 DAC port
63 Expansion shelf 2OCP port 2
3. (Optional) Cable another expansion shelf to the array:
• For HPE Alletra 6010: You can connect only one expansion shelf.
• For HPE Alletra 6030, 6050, 6070, 6090: You can connect up to two expansion shelves.
a) Connect OCP port P2 of controller A on the array to the DAC port on expander A of the second expansion shelf.
b) Connect OCP port P2 of controller B on the array to the DAC port on expander B of the second expansion shelf.
Note: Wait at least 3 (three) minutes between each additional expansion shelf connection to ensure the firmware
update is complete.
4. Activate the expansion shelf.
Install the Expansion Shelf 60
Documentation Feedback: doc-feedback-hpe-storage@hpe.com