4. Replace the SFP transceiver.
a) With the retaining latch closed, gently slide the new SFP transceiver into the port.
b) Remove the dust cover from the new SFP transceiver.
c) Insert the cable into the new SFP transceiver.
5. Verify that the port is online using one of the following methods:
• In the GUI, click Hardware, and verify that the port is connected (green). Mouse over the port to see the link status
and the negotiated speed.
• In the CLI, enter the command array_name: nic --list, and then review the link status and negotiated speed.
6. Return the failed SFP transceiver as directed on the RMA work order.
Replace a Fan
Use this procedure to replace a fan in your HPE storage array or expansion shelf.
Before you begin
15 to 30 minutesTime required:
Replacement fan ordered from HPEParts required:
• RMA (Return Materials Authorization) work order
• Case number
• Array name or serial number
The array serial number can be found on the pullout System Info tab.
Information required:
See Support.Support contact:
Maintenance Procedures 85
Documentation Feedback: doc-feedback-hpe-storage@hpe.com