EasyManua.ls Logo

HP HPE Alletra 6010

HP HPE Alletra 6010
136 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
RMA (Return Materials Authorization) work order
Case number
Array name or serial number
The array serial number can be found on the pullout System Info tab.
Information required:
See Support.Support contact:
HPE recommends using the Maintenance Window functionality within the HPE InfoSight portal to inform HPE Support of
upcoming maintenance windows.
Refer to https://infosight.hpe.com/dashboards/nimble/wellness/maintenance-windows for more information.
You can disable automated support case generation during planned maintenance from the Manage Maintenance Windows
page. After a maintenance window is set, no further communication with HPE Support is required.
Note:
Before you attempt to replace a power supply:
Do not remove the PSU until you are ready to install the
replacement
Never unplug or unseat both PSUs at the same time
Both PSUs in a controller or expander must be the same
Use only UL-approved power cords
Procedure
1. Identify the power supply to replace. In the software, the right power supply is PSU1, and the left power supply is PSU2.
2. Remove the power cord from the PSU.
3. Push the power supply release lever to the left, grasp the handle, and pull out the power supply.
31 Power supply handlePower supply LED
2 Power supply release lever
4. Insert the new PSU. Push in gently until you hear a click.
5. Connect the power cord to the power supply.
6. Secure the power cord in the strain relief strap that is attached to the power supply handle.
Maintenance Procedures 94
Documentation Feedback: doc-feedback-hpe-storage@hpe.com

Table of Contents

Related product manuals