13. Cable the controller .
14. Install the air baffle .
15. Install the access panel .
16. Do one of the following:
Orient the server back to tower mode.
Install the server into the rack .
17. Connect all peripheral cables to the server.
18. Connect each power cord to the server.
19. Connect each power cord to the power source.
20. Power up the server.
21. To configure the controller, see the relevant storage controller guide .
ResultsResults
The installation is complete.
Energy pack optionsEnergy pack options
If there is an unplanned server power outage, the flash-backed write cache (FBWC) feature of HPE storage controllers requires a centralized
backup power source to back up the write cache data in a flash device. This server supports the following power options—collectively
known as energy pack:
HPE Smart Storage Battery
HPE Smart Storage Hybrid Capacitor
One energy pack supports multiple devices. After it is installed, the status of the energy pack appears in HPE iLO. For more information, see
the iLO user guide: