EasyManua.ls Logo

HP ProLiant ML30 Gen11 - Operational Requirements; Space and Airflow Requirements

HP ProLiant ML30 Gen11
170 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5. If the server is using a non-hot-plug power supply, secure the power cord in the power cord clip on the rear panel.
a. Press and hold the clip retainer, and then open the clip.
b. Position the power cord inside the clip, and then close the clip.
6. Power up the server.
Operational requirementsOperational requirements
When preparing the site and planning the installation for the HPE ProLiant ML30 Gen11 Server, be sure to observe the following general
operational requirements:
Space and airflow requirements
Temperature requirements
Power requirements
Electrical grounding requirements
For server-specific environmental requirements, see Environmental specifications.
SubtopicsSubtopics
Space and airflow requirementsSpace and airflow requirements
Temperature requirementsTemperature requirements
Power requirementsPower requirements
Electrical grounding requirementsElectrical grounding requirements
Space and airflow requirementsSpace and airflow requirements
HPE ProLiant ML30 Gen11 Server User Guide 37

Table of Contents

Related product manuals