Server warnings and cautions
A fully populated server is heavy. Hewlett Packard Enterprise recommends removing the external chassis components before installing
the server into a rack.
Before you perform this procedure, make sure that you have a T-15 Torx screwdriver available.
ProcedureProcedure
1. Grasp the tray notch to slide the tray out of the rack.
2. Place the server on the tray.
Verify that the front panel of the server is aligned with the front of the tray.