10. Reconnect any system cables that were disconnected in step 7.
11. Install the air baffle .
12. Install the access panel .
13. Install the front bezel .
14. Do one of the following:
Orient the server back to tower mode.
Install the server into the rack .
15. Connect all peripheral cables to the server.