MSL6000 series pass-through mechanism reference guide 15
Figure 4 Installing the LAN hub into a system/e rack
X Front of rack enclosure
3. Connect the AC power cable to the LAN hub and to the rack enclosure AC power outlet. Do not
turn the LAN hub on at this time.
4. Attach the 10-BaseT cables to the LAN hub for each library. See ”Cabling the PTM and LAN
Hub” on page 31 for connecting instructions.
5. Attach a network cable to the LAN hub. See the section on ”Cabling the PTM and LAN Hub” on
page 31 for instructions.
1