6. Install the server into the rack.
Install the Install the serverserver into the into the rackrack
PrerequisitesPrerequisites
Get help to lift and stabilize the server during rack installation. If the If the serverserver is installed higher than chest level, an additional person is installed higher than chest level, an additional person
might be required to help install the might be required to help install the serverserver:: One person to support the server weight, and the other to slide the server into the rack.
Before you perform this procedure, review the:
Rack warnings and cautions
Server warnings and cautions
Space and airflow requirements
A fully populated server is heavy. Hewlett Packard Enterprise recommends removing the external chassis components before installing
the server into a rack.
Before you perform this procedure, make sure that you have a T-15 Torx screwdriver available.
ProcedureProcedure
1. Grasp the tray notch to slide the tray out of the rack.
HPE ProLiant ML110 Gen11 Server User Guide 81