EasyManua.ls Logo

HPE ProLiant XL270d Gen9 - Installing the Air Baffle

HPE ProLiant XL270d Gen9
146 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing the air baffle
About this task
Install the air baffle
CAUTION:
To prevent damage to the server, ensure that all DIMM latches are in closed and locked position before
installing the air baffle.
Procedure
1. Install the air baffle.
2. If removed, connect the 4:1 riser signal cable:
a. Connect the cable to both the connectors.
b. Ensure that the latches are closed.
28 Installing the air baffle

Table of Contents

Related product manuals