5 Installation and commissioning
HSD S.p.A. © - h0104k01a.fm291119
47
5.10 General checks after installation
Verify the correct wiring before start-up.
Check that the plastic dipswitch access window is properly closed. If the window is not
present, the equipment IP degree gets compromised.
5.11 Running-in
The products, before being packaged, undergo an automatic running-in cycle to guarantee the
correct distribution of the lubricant in the races of the bearings. The running-in cycle also includes
a detailed check of all the control and signalling devices through the simulation of various
machining cycles on the test-bench. The customer must not launch any additional running-in
procedure.
5.12 Environmental conditions
The manufacturer has inspected and tested its products under standard environmental conditions
(refer to paragraph A.1 “General data” for a detailed description of the environmental values).
Contact HSD S.p.A. for information about the possibility of applications for special environments.