EasyManua.ls Logo

Huawei FusionServer Pro CH121 V5 - Page 113

Huawei FusionServer Pro CH121 V5
181 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 5-12 Installing one end of the processor
3. Bend the other edge of the processor carrier in the arrow direction.
Figure 5-13 Installing the other end of the processor
4. Release the processor carrier so that the other edge of the processor clips into place.
5. Check that the processor and the carrier are level and the processor is firmly secured. If
the processor is tilted, press the tilted part to fasten it.
Step 11 Apply thermal compound.
1. Determine the area on the processor that will be in contact with the heat sink, and evenly
apply 0.4 ml of thermal compound on the area.
NOTE
When applying thermal compound, place the processor carrier on the desktop.
The thermal compound injector has volume marks.
The two-line, five-dot, s-shape, and X-shape patterns are recommended.
FusionServer Pro CH121 V5 Compute Node
User Guide
5 Optional Part Installation
Issue 06 (2019-08-10) Copyright © Huawei Technologies Co., Ltd. 105

Table of Contents

Related product manuals