EasyManua.ls Logo

Huawei SUN2000L - Starting or Shutting down the SUN2000 L

Huawei SUN2000L
151 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SUN2000L-(2KTL-5KTL)
User Manual
7 Operations on the Local FusionHome App
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
83
Check Type
Description
External Signal
Setting
Local Command
Setting
S2
The level 1
overfrequency
protection threshold
is 51.5 Hz and the
level 1
underfrequency
protection threshold
is 47.5 Hz.
S2
The level 1
overfrequency
protection threshold
is 51.5 Hz and the
level 1
underfrequency
protection threshold
is 47.5 Hz.
Step 3 Tap Start to start the check. After the check is complete, IPS State is displayed as Self-test
success.
----End
7.4.3.5 Starting or Shutting Down the SUN2000L
Procedure
Step 1 On the Operation console screen, choose Device maint > Inverter ON/OFF, and perform
operations as required.
Figure 7-30 Starting or shutting down the SUN2000L

Table of Contents

Related product manuals