Documents and Forms
2.7
____ CO detectors operational
____ Engine compartment blower operational
____ Auto re suppression system operational (engine compartment)
____ Shore power cord and adapter plug operational. (See manufacturer’s manual for complete details.)
____ 110 or 220 VAC outlets operational - ground fault circuits functioning
____ 110 or 220 VAC inverter/battery charging systems functioning properly
Fresh Water Systems
____ Hot water heater drain shut
____ All spigots and hose bibs shut
____ All tank(s) ushed clean and free of debris and antifreeze
____ Water heater tank and lines ushed of antifreeze
____ All water lines and components purged of air and checked for leaks
____ Sinks and drains checked for leaks and adequate ow
____ Cockpit shower operational
____ Fresh water lters clean
____ Tank water level indicator systems operating- labeling and tank valve selection correspond
Head and Holding Tank Systems
____ Vent clear from tank to atmosphere
____ Filled with fresh water (electric head)
____ Toilets ush to holding tanks properly
____ Waste level indicating system properly functioning
____ No leaks at any hose tting within the system
Galley Systems
____ Stovetop or oven operational (Refer to manufacturer’s manual for proper operation and trouble shooting.)
____ Gimbal latch secure and operational
____ Microwave operational
____ Refrigerator operational and proper temperature attained
____ Freezer operational and proper temperature attained
____ Icebox drains properly
____ Icebox drain plugs installed
____ USCG waste disposal-warning poster onboard or in owner’s package
____ LPG tank lled, installed and connected to regulator; inspect Gas system for leaks after 3 minutes
(Should a leak be detected immediately close the main valve exit boat and seek professional assistance for a
thorough inspection.)
____ LPG storage locker drain open and tank storage area free of debris
Topside Inspection
____ Swim platform operates properly
____ Cockpit cushions cleaned and installed
____ Canvas properly cleaned and installed
____ Rubrail properly secured to hull
____ Load bearing hardware securely fastened; this includes but is not limited to cleats and handrails
____ Lifeline ttings tight and secure
____ Sliding hatch drains free of debris