EasyManua.ls Logo

Hunter MH37 - Fresh Water Systems

Hunter MH37
271 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Documents and Forms
2.7
____ CO detectors operational
____ Engine compartment blower operational
____ Auto re suppression system operational (engine compartment)
____ Shore power cord and adapter plug operational. (See manufacturer’s manual for complete details.)
____ 110 or 220 VAC outlets operational - ground fault circuits functioning
____ 110 or 220 VAC inverter/battery charging systems functioning properly
Fresh Water Systems
____ Hot water heater drain shut
____ All spigots and hose bibs shut
____ All tank(s) ushed clean and free of debris and antifreeze
____ Water heater tank and lines ushed of antifreeze
____ All water lines and components purged of air and checked for leaks
____ Sinks and drains checked for leaks and adequate ow
____ Cockpit shower operational
____ Fresh water lters clean
____ Tank water level indicator systems operating- labeling and tank valve selection correspond
Head and Holding Tank Systems
____ Vent clear from tank to atmosphere
____ Filled with fresh water (electric head)
____ Toilets ush to holding tanks properly
____ Waste level indicating system properly functioning
____ No leaks at any hose tting within the system
Galley Systems
____ Stovetop or oven operational (Refer to manufacturer’s manual for proper operation and trouble shooting.)
____ Gimbal latch secure and operational
____ Microwave operational
____ Refrigerator operational and proper temperature attained
____ Freezer operational and proper temperature attained
____ Icebox drains properly
____ Icebox drain plugs installed
____ USCG waste disposal-warning poster onboard or in owner’s package
____ LPG tank lled, installed and connected to regulator; inspect Gas system for leaks after 3 minutes
(Should a leak be detected immediately close the main valve exit boat and seek professional assistance for a
thorough inspection.)
____ LPG storage locker drain open and tank storage area free of debris
Topside Inspection
____ Swim platform operates properly
____ Cockpit cushions cleaned and installed
____ Canvas properly cleaned and installed
____ Rubrail properly secured to hull
____ Load bearing hardware securely fastened; this includes but is not limited to cleats and handrails
____ Lifeline ttings tight and secure
____ Sliding hatch drains free of debris

Table of Contents

Related product manuals