EasyManua.ls Logo

Hypertherm HyPrecision Predictive P-50S - Page 119

Hypertherm HyPrecision Predictive P-50S
231 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
HyPrecision Predictive waterjet pump Operator Manual 810120 119
5 – Preventive maintenance
Preventive maintenance
3. Put the high end cap onto the check valve and the studs with the water fitting pointed toward the attenuator.
4. Put antiseize bolt lubricant on the stud threads.
5. Tighten the nuts on the studs by hand.
Put the smooth side of the nut toward the high-pressure end cap.
6. Torque the end cap nuts to 375 N m (275 lbf ft).
Tighten each fastener in 68 N m (50 lbf ft) increments. Use a repeating cross pattern.
7. Connect the low-pressure water line.
8. Install the drip tray under the high-pressure end.

Table of Contents

Related product manuals