EasyManua.ls Logo

IBM 1 Series - Page 48

IBM 1 Series
198 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
last
‘service
gate
return’)
to
the
deactivation
of
the
‘IPL
tag’
has
a
minimum
time
of
0;
the
maximum
time
is
device-dependent.
Following
the
successful
completion
of
IPL
and
the
dropping
of
the
‘IPL’
tag,
the
host
IPL
device
must
be
prepared
to
level
0
with
its
I-bit
on
and
present
an
interrupt
request
to
the
processor
I/O
channel.
The
device
must
be
available
in
all
other
respects.
When
the
interrupt
is
accepted,
the
device
presents
the
device-end
interrupt
condition
code.
©%
Initial
Sequence
to
Normal
End
Asynchronous
I/O
activity
i
NA
Host
IPL
command
—————>
IPL
=
CT2
CT1
System
reset
T3
IPL
cycle
requests
and
transfers
©
Termination
and
Retry
1.
System
Reset
IPL
~~
a
CT1
Tl
CT2
2___»
System
reset
2.
Hung
IPL
Host
IPL
command
IPL
o\
ee
ee
Timings:
T1
>
3
us
Legend:
3us<T2
<7
us
T3
>
T4
>
CT1
>
4.8
us
0<CT2
<
500
us
CT3
<
1.8
us
0
CT
=
channel
times.
0
T
=attachment
controlled
times
Figure
2-15.
Host-initiated
IPL
sequence
timing
diagram
Processor
I/O
Channel
2-37

Table of Contents

Related product manuals