EasyManua.ls Logo

IBM 6.1.8.2 - User Manual

IBM 6.1.8.2
114 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
IBM Storage ScaleSystem Utility Node
6.1.8.2
Hardware Planning and Installation
Guide
IBM
SC28-3469-00

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the IBM 6.1.8.2 and is the answer not in the manual?

IBM 6.1.8.2 Specifications

General IconGeneral
BrandIBM
Model6.1.8.2
CategoryStorage
LanguageEnglish

Summary

About this Information

Who Should Read this Information

Identifies the target audience for the document.

IBM Elastic Storage System Information Units

Lists the different documentation components for ESS.

Conventions Used in this Information

Chapter 1. Notices

Safety and Environmental Notices

Critical safety and environmental information for product installation and use.

Danger Notices for the System

Details critical hazards and precautions for system operation.

Caution Notices for the System

Provides important cautions and safety guidelines for system handling.

FCC Certification

Details FCC certification for the ESS 3500 and customer responsibilities.

Electromagnetic Compatibility Notices

Class A statements for electromagnetic compatibility (EMC).

Chapter 2. Technical Overview

System Overview

Provides a general overview of the utility node's capabilities and architecture.

IBM Storage Scale System Utility Node Specifications

Provides detailed hardware specifications for the utility node.

Chapter 3. Planning for Hardware

Planning for Site Preparation

Guidance on preparing the physical site for utility node installation.

Planning for Hardware Installation

Key planning steps before installing the system hardware.

Planning for Racks

Requirements and guidelines for integrating the utility node into a rack.

Operating Environment

Specifies hardware/software requirements and environmental criteria for system operation.

Environmental Requirements

Details environmental conditions like temperature, humidity, and altitude for operation.

IP Address Allocation and Usage

Guidelines for allocating and using IP addresses for system management and service.

Chapter 4. Installing

Detailed Installation Steps (SSR Task)

Step-by-step instructions for authorized service personnel.

Mark EIA Locations for Rail Mounting

Procedures for marking rack locations for server rail installation.

Mounting the MTM 5149 - 23 E Server Chassis in a Rack

Detailed instructions for mounting the server chassis into a rack.

Unpacking the IBM Storage Scale System Utility Node (IBM SSR Task)

Steps for unpacking the utility node and its components.

Installing Enclosures (IBM SSR Task)

Procedures for installing the utility node enclosure into the rack.

Chapter 5. Monitoring the System Using LEDs

System Status LED

Explains the system status LEDs on the front panel of the utility node.

Power Supply Unit (PSU) LEDs

Details the status LEDs for the power supply units (PSUs).

Ethernet Port LEDs

Describes the LEDs indicating speed and link activity for Ethernet ports.

Appendix A. Slot Placement Summary for the Utility Node (MTM 5149 - 23 E)

Appendix B. PCIe Gen 4 x16 2-port HDR 100 Gb InfiniBand ConnectX-6 Adapter (FC EC6 G; CCIN 590 E)

Overview

Provides a general description of the ConnectX-6 adapter.

Specifications

Lists the technical specifications for the ConnectX-6 adapter.

Accessibility Features for the System

Accessibility Features

Lists major accessibility features implemented in the system.

Glossary

Index

Related product manuals