11
Installation and Servicing
SECTION 1 - GENERAL
395
2.5
2.5
from case
700
Side flue
dim. A
CH FLOW
COND DRAIN
Underside View - Pipe Dimensions to Wall
Water Connections and Gas Connection
W A L L
GAS INLET
CH RETURN
PRV
DATA PLATE
1.16 BOILER DIMENSIONS, SERVICES & CLEARANCES - INTERNAL
all dimensions in mm
The boiler connections are made on the boiler connection tails.
Refer to Section 2.19.
The following minimum clearances must be maintained for
operation and servicing.
Additional space will be required for installation, depending upon
site conditions.
Front clearance
The minimum front clearance when built in to a cupboard is 5mm from the cupboard door but 450mm
overall clearance is still required, with the cupboard door open, to allow for servicing.
* Bottom clearance
Bottom clearance after installation can be reduced to 5mm.
This must be obtained with an easily removable panel to provide the 100mm clearance required for