Note.
A at or pitched roof ashing plate (not supplied) is required before proceeding
with the installation of this kit.
Connection to the top of the boiler is made using a separately supplied vertical
WEaThER pROOFINg
- Flat roof weather collar
or
aCCEssORIEs
contain 1m extension ducts and may be cut
If the offset vertical option is used an elbow