INsTaLLaTION
Ideal Logic Code Combi ES - Installation and Servicing
29
ExTERNaL ELECTRICaL CONTROLs
Wiring External to the Boiler



Frost protection
If parts of the pipework run outside the house or if the boiler will be left off
for more than a day or so then a frost thermostat should be wired into the






Note If the boiler is installed in a garage it may be necessary to t a pipe
thermostat, preferably on the return pipework.
3G9503
LN
Room Stat
Timer Room stat
Frost Stat
Mains In
separate Timer and Room stat
LN
Room Stat Frost Stat
Mains In
programmable Room stat
LN
Room Stat Frost Stat
Mains In
Use of general Live for Room stat
Programmable
Room
Stat
Room
Stat
Optional
Frost Stat
Optional
Frost Stat
Optional
Frost Stat
3G9560
N
L
N
FROST
STAT
(
OPTIONAL)
ROOM
STAT/
TIMER
Room
Stat or
Prog.
Room
Stat
Optional
Frost Stat
diagram a
Internal Timer or
Programmable Room Stat
3G9561
N
L
N
FROST
STAT
(
OPTIONAL)
ROOM
STAT/
TIMER
Room
Stat
Optional
Frost Stat
diagram B
External
Timer
28
REpLaCINg pRE-FITTED MaINs CaBLE



1. 
2. 
3. 
4. 
5. 
6. Route replacement cable back through the cable clamp and grommet and re-tighten

7. 
mains electrical connections to the boiler it is important that the wires are prepared in
such a way that the earth conductor is longer than the current carrying conductors,
such that if the cord anchorage should slip, the current carrying conductors become

8. 

5
4
Earths are not shown for clarity but must
never be omitted.
27
INTERNaL WIRINg
INsTaLLa TION