gas sUppL y
planning stage, in order to establish the availability of an adequate
A gas meter can only be connected by the local gas supplier or
An existing meter should be checked, preferably by the gas
supplier, to ensure that the meter is adequate to deal with the rate
It is the responsibility of the Gas Installer to size the gas
When operating pressures are found to be below the minimum
Allowing for the acceptable pressure loss of 1mb across the
installation pipework, it can be assumed that a minimum permitted
IMpORTaNT.
FLUE INsTaLLa TION
1.
LOCaTION OF BOILER
capable of adequately supporting the weight of the boiler and any
between the wall and the boiler is not necessary, unless required
For electrical safety reasons there must be no access available
The boiler must not be tted outside.
Timber Framed Buildings
Bathroom Installations
Ip20.
particular attention is drawn to the requirements of the current
the installation of the boiler in a room or internal space containing
If the appliance is to be installed in a room containing a bath or
shower then, providing water jets are not going to be used for
cleaning purposes (as in communal baths/showers), the appliance
Compartment Installations
A compartment used to enclose the boiler should be designed and
An existing cupboard or compartment may be used, provided that
In both cases, details of essential features of cupboard /
compartment design, including airing cupboard installation, are to
conform to the following:
subsequent service, see the wall mounting template and