EasyManua.ls Logo

iDig 2D Touch - Page 59

iDig 2D Touch
187 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation Procedures Auger Calibration
Calibration on a New Machine
Quick coupler
59
Measure and enter the distance between the swing
pivot/quick link and the front/rear pivot of the auger.
Click on “Next.
Align the swing pivot/quick ling and the front/rear
pivot on a vertical axis.
Click on “Next.
For “floating” augers as shown here the
distance to be entered is zero (0).