EasyManua.ls Logo

iDig 2D Touch - User Manual

iDig 2D Touch
187 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
1
iDig 2D Touch
User Manual
Bridgin Groupe
21 Boulevard Littré
78600 Le Mesnil le Roi
France
+33 9 73 87 04 25
www.idig-system.com
Question and Answer IconNeed help?

Do you have a question about the iDig 2D Touch and is the answer not in the manual?

Summary

Calibration Procedures

Pre-Installation and Hardware Setup

Pre-installation checklists, hardware installation, and initial system settings.

Sensor Installation Procedures

Procedures for installing various sensors (Main Boom, 2nd Boom, Dipper Stick, Bucket).

Core Calibration Processes

Calibration for major components like booms, buckets, lasers, and 2D sensors.

Specialized Equipment Calibration

Calibration procedures for specialized equipment and functions.

Checking System Accuracy

Methods to verify the accuracy of machine and bucket calibration.

Applications

Main Screen Overview

Explanation of the main user interface and its features.

Digging Operations

Guidance on digging to elevation, depth, slope, and using laser/dozer functions.

Machine Movement and Referencing

Instructions for moving the machine and managing references on the job site.

Advanced Features and Settings

Using features like bucket changing, tape measure, height alarm, and system settings.

Import; Export Function

Using a USB stick to import and export machine data and settings.

iDig 2D Touch Specifications

General IconGeneral
BrandiDig
Model2D Touch
CategoryIndustrial Equipment
LanguageEnglish