3.9 PROGRAMMING THE P.C.B.
e boiler is prepared for possible programming of several ope-
ration parameters. By modifying these parameters as described
below, the boiler can be adapted according to specic needs.
To access the programming phase, proceed as follows (references
Fig. 30).
- press buttons (1) and (2) for 5 about seconds until the program-
ming mode is accessed on the display;
- using keys (3) and (4), select the parameter to be changed indi-
cated in the following table:
- adjust the corresponding value consulting the table using keys
(5) and (6): rst pressure of buttons displays the current value;
- conrm the value set by pressing the Reset button (1) for about
5 seconds. Only the displayed value is saved.
N.B.: 2 minutes aer no button is touched will automatically
cancel the operation or by pressing buttons (1) and (2) simulta-
neously for about 5 seconds. Modied but not conrmed values
are to be restored to the value preceding the modication.
Id
Parameter
Parameter Description
Range
(ref. 9 Fig. 33)
Default
P00
Solar panels
selection
e setting of this function is used to set the boiler in order to function
with the use of solar panels. By setting the parameter P0 in "solar"on
mode, the switching o of the burner is correlated to the adjustment of the
domestic hot water temperature. In OFF mode, the burner is switched o at
maximum value.
on - oF oF
P01
Gas type selec-
tion
e setting of this function is used to adjust the boiler so that it can operate
with the correct type of gas
nG - Methane
LG - LPG
Set according
to the gas being
used
P02
Heating switch-
on delay request
from room
thermostat and
remote control.
e boiler is set to switch-on 3 seconds aer the request. In the event of
particular systems (e.g. area systems with motorised thermostatic valves
etc.) it may be necessary to delay ignition
00 - 20
(00 = 3 seconds
01 = 30 seconds
02 = 60 seconds
20 = 600 seconds)
00
P03
Function
anti-leakage
is function reduces the heating temperature to 57°C in the case that
domestic hot water circulation is detected in the heating mode.
on - oF oF
P04
Domestic hot
water post circu-
lation function
With the post-circulation function active aer domestic hot water withdra-
wal, the pump remains on for 2.5 seconds in winter time and 1.5 seconds in
summer time to reduce the formation of limestone.
on - oF on
P05
Minimum CH
output
e boiler also has electronic modulation that adapts the boiler potentiality
to the eective heating demand of the house. en the boiler works nor-
mally in a variable gas pressure eld between the minimum heating output
and the maximum heating output depending on the system's heating load.
NOTE: the boiler is produced and calibrated in the central heating phase at
nominal output. Approximately 10 minutes are needed to reach the nomi-
nal heat output, which can be changed using the parameter (P08).
NOTE: the selection of the “Minimum heating output” and “Maximum
heating output” parameters, in presence of a heating request, allows boiler
ignition and power supply of the modulator with current equal to the value
of the respective set value.
00 - 70 %
Set according to
factory inspec-
tion
P06
Maximum CH
output
00 - 99
(99 = 100%)
99
P07
Central heating
ignitions timer
e boiler has electronic timing, which prevents the burner from igniting
too oen in central heating mode
01 - 20
01 = 30 seconds
02 = 60 seconds
20 = 600 seconds
06
P08
Central heating
ramp timer
In the ignition phase, the boiler performs an ignition ramp in order to
arrive at the maximum nominal power set (P06).
01 - 20
01 = 30 seconds
02 = 60 seconds
20 = 600 seconds
20
P09 Boiler type Not used on this model. 01 01
P10
Power
ignition
Not used on this model. - - - - - -
P11
Minimum
heating setting
Denes the minimum ow temperature 35 - 80 °C 35 °C