Quick Operation
28
Table 6–4 Check items before power‑on
No. Item
Checked
1
Main circuit
wiring
The power supply voltage is correct (three‑phase
380480 VAC, 50/60 Hz; single‑phase 200‑240 VAC, 50/60
Hz).
2
The power supply input terminals and the AC drive
input terminals (R/S/T or L1/L2) are connected properly.
The power supply voltage is correct (three‑phase
380480 VAC, 50/60 Hz; single‑phase 200‑240 VAC, 50/60
Hz).
3
The motor input terminals and the AC drive output
terminals (U/V/W) are connected properly.
4
The AC drive and motor are properly grounded.
5
The dimensions of the main circuit cables meet the
requirements.
6
Heat‑shrink tubes have been applied to the copper lugs
and conductors of the main circuit cable and
completely wrap the cable conductors.
7
The motor output cable does not exceed 50 m.
Otherwise, the carrier frequency needs to be reduced
through A5‑01.
8
Control
circuit
wiring
The control circuit terminals are reliably connected to
other control devices.
9
The control circuit signal cables are shielded twisted
pair cables.
10
Optional cards are connected correctly.
11
Control circuit cables and main circuit power cables are
routed separately.
12
The control circuit terminals of the AC drive are all in
the OFF state (the AC drive is not running).
13
Load
The motor is in the no‑load state and is not connected
to any mechanical system.
14
Braking
resistor
The braking resistor and braking unit (if have) with
proper resistance are wired properly.
6.3 Operation upon Initial Power-on
6.3.1 Basic Commissioning Flowchart
The following figure describes the basic commissioning flow of the AC drive.